◇ Zen Insurance · Nova AI
← All playsrequirements capture — every decision point, read from the FigJam
📖 How to read this playbook (and how I read the FigJam)

Each page below is one decision point from the top-level map — one "play." The left pane recreates the FigJam tree exactly as drawn (same branch labels, same terminal boxes); the right pane is the same tree flattened into path → terminal state rows, so every route to an outcome can be checked line by line.

How I read each board: start at the entry decision, walk every arrow to a terminal box, and record the full condition path — then capture the sticky notes separately, because they answer a different question: not "what's the rule?" but "what do we do when the field is MISSING?" (look it up, assume a default, or follow up). Where two arrows overlap and the wiring is genuinely ambiguous, I did not guess — those became the questions at the bottom of the page.

decision / question okay to quote / write require (condition, usually time-bound) decline / cancel sticky note (missing-data guidance)

Dashed-underlined terms open a ? glossary dialog — the shared vocabulary (UWing period, Knox Box, KYC, P(F), RCE…) captured while reading. Each page also notes where an agent helps: the exact spots a decision would stall on vague or missing info, and whether the unstick is a lookup, a derivation, the board's own assume-and-verify default, or one scoped question.

Fire Simulation

When the wildfire model says Fail / Do-Not-Write, the play is a documented manual review — “legacy underwriting” — that can still reach a quote.

The decision tree (as drawn)
Fail /Do Not WriteFail /Do Not WriteCheck AccessLimitedMultiple pointsCheck AccessInsufficientSufficientAssess VegetationHeavyNoYesModerate / LightSteep — clearanceneeds increaseNoYesGentle / LevelYesNoAdequateToo closeFire SimulationDeclineConsider Legacy UWingMap risk viaGoogle Maps / ZillowIngress / EgressDeclineContinue to QuoteResponderturn-aroundDeclineContinue to QuoteVegetationDetermine client willingnessto mitigate greater distanceDeclineQuoteCheck SlopeClient willingnessto mitigate?DeclineQuoteQuote7A Compliant?Check Slope(routes toward decline —arrow ambiguous, see Q2)Min distance toneighbors' homeContinue to QuoteDeclineQuote →Determine preliminary mitigationplan to discuss with broker
The logic, captured
How I read this

What makes this board special: it is the playbook's HUMAN-OVERRIDE protocol. The model can be wrong at the edges, so a Fail doesn't end the conversation — it opens a hand-check of the model's own inputs (access, vegetation, slope, 7A, neighbor distance), and even a willing-to-mitigate conversation with the client. And a successful override doesn't just quote — it produces a mitigation plan for the broker.

PathTerminal state
Model verdict Fail / Do-Not-Write, no override pursuedDECLINEDecline
Override: legacy UW review — map the risk on Google Maps/ZillowNOTEhand-check of the model inputs, below
Access → ingress/egress limited · responder turn-around insufficientDECLINEDecline
Access → multiple points · turn-around sufficientOK / QUOTEContinue to quote
Vegetation heavy → client willing to mitigate greater clearance?REQUIREYes → quote · No → decline
Vegetation moderate/light → slope gentle/levelOK / QUOTEQuote
… slope steep (clearance needs increase) → willingness checkREQUIREYes → quote · No → decline
7A compliant → yesOK / QUOTEproceed via slope check
Min distance to neighbors adequate / too closeDECLINEContinue / Decline
Any successful quote pathREQUIREQuote + determine a preliminary mitigation plan to discuss with the broker
Board notes (missing-data guidance)
📝 “zillow” (small standalone note by the mapping step)
Where an agent helps (unsticking the underwriter)
  • The legacy-review evidence is gatherable before the underwriter opens the file: maps/satellite imagery for access and vegetation, parcel data for slope and neighbor distance — an agent assembles the override dossier so the human check takes minutes, not an afternoon.
  • The "willing to mitigate?" step is the playbook's one crisp outbound message on this board — an agent drafts it with the specific clearance ask already computed.
  • A quote here must ship WITH a preliminary mitigation plan — a document an agent can draft from the same checks that justified the override.
Sam's questions for the analyst
  1. Is the model's output the same P(F) the Roof/Siding boards band on, or a separate Fail / Do-Not-Write verdict?
  2. The “7A Compliant → No” arrow's destination is ambiguous among crossing connectors — I read it as weighing toward decline. Confirm?
  3. Is the legacy-UW override formally documented per case (who signed off, which checks passed)? That matters for how the mitigation plan is tracked.